Equipment Category: Biomass

BOILER ROOM AND POWERHOUSE FOR IMMEDIATE SALE

Consisting of the Following Machinery:

• 1 Each Elliot 390KVA Steam Turbine with Elliot/Hartfield Electric Model 6144 AC Generator 3150kW @ 3600RPM
• 1 Each IEC Model G446KNT 1500kW AC Generator with Terry Steam Turbine
• 1 Each 20-Ton Capacity Bridge Crane
• 1 Each Combustion Engineering Model DG/33/19 Gas-Fired Boiler with blowers & Combustion Systems
• 1 Each Dual Fuel Boiler with Detroit Stoker Grate, Coal- Pulverizer, Dust Collector, Blowers, Ash Handling System
Power Boilers Consisting of:

2 Boilers at 70,000 pounds/hour each with a combined rating of 140,000 PPH at 800 PSI
60 cycles, 3 Phase Generating 72,000 KWH/day
Dual Fuel Boiler Burning: Wastepaper, BioMass, Wood , Coal, Biodiesel, Oil, Gas,
Second Boiler is a Gas Boiler

CLARIFICATION POINTS:

THERE ARE TWO (2) BOILERS. MANUFACTURED BY NATL BOILER IN BISTRAL BARANQUILA COLOMBIA, 1986.
INCLUDES DETROIT STOKERS AND ONE COMPLETE ELECTRONIC SYSTEM TO TREAT BOILER DISCHARGE.
THERE ARE TWO (2) PRECIPITATORS) FOR THIS BOILER PACKAGE.
THERE IS AN ELECTRONIC PARTICLE SEPARATOR WITH A TWO STEP PROCESS AS WELL AS A BACK PRESSURE OF 10-20,000 LBS OF WASTE WHICH COULD BE UTILIZED.

THIS BOILER WAS GOING TO BE USED TO BURN PAPER WASTE, WOOD WASTE AND GARBAGE (BIOMASS) .
CAN ALSO BURN BIODIESEL, COAL, WOOD, ETC.
THIS BOILER IS A 70,000 PPH BIOMASS SYSTEM.
MAXIMUM SUPER HEATED PRESSURE IS 800 PSI.
IT PRODUCES SUPER HEATED STEAM AT 800 DEGREES FAHRENHEIT.
THE HEATING SURFACE OF THE BOILER IS: 7680 SQUARE FEET
THE WATER WALL IS: 1583 SQUARE FEET.
THE DETROIT STOKER
2 BAGS FOR DUST COLLECTION
4 BAGS FOR ASH COLLECTION.
ALSO INCLUDES AN ASH HOLDING TANK

THE OFFERING IS SOLD COMPLETE WITH THE AIR METERING CONTROLS AND STACK.
THE WATER WAS CAUSTIC TREATED AND HAS A NALCO PUMP SYSTEM.
THIS BOILER WAS NEVER USED. THEY ONLY TESTED IT WITH SOME COAL.
NOTES:
THE SECOND BOILER IS A NATURAL GAS AND RAN 70,000 LBS/HR. IT WAS PURCHASED IN 1986 AND RAN UNTIL 2000 WHEN THE MILL SHUT DOWN. AFTER SHUT DOWN, IT WAS GASED TO PREVENT CORROSION.
THE BOILER WAS PURCHASED ONLY STARTED FOR TRIALS. IT WAS NEVER POINT INTO OPERATION.
THE TURBINES AND ALL THE ELECTRICALS, INSTRUMENTATION, MANUALS, DRAWINGS, ARE INCLUDED.
THE ENTIRE SYSTEM CAN BE CONVERTED FOR 50HZ OPERATION.
BOILER ROOM AND POWERHOUSE FOR IMMEDIATE SALE
& WILL CONSIDER SELLING COMPONENTS PARTS THEREOF: